These are the estimates we have received to complete phase two of our building and property improvement project. We have a challenge from the couple that paid our first building project off to match what they gave, which was $42,500. This paid off the initial phase, and left a balance of $2,500 to go toward this phase two. We are asking you to pray with us about this next step. This is how the first one was completed -- by much prayer and the generous hearts of many of you.

 

We thank the Lord for an anonymous donation of $10,000 toward our Phase Two building project!-- 5/20/2010

 

Thermometer

ESTIMATES FOR PHASE TWO

 

Gates:  

Two 20' gates in front, opening to a 40' entrance off street, one 12' gate in rear at exit from property. Both with remote openers, key pads, and an electric eye to prevent gate closing on vehicle entering or leaving: $22,354.50

 

Sealing and striping the parking lot:  

Seal asphalt and stripe off car and truck parking, install handicap signs, stripe driveway all the way through property: $6,500.00

 


30' x 28' Addition on building, turnkey:  

The addition will be the warehouse, shipping and receiving area for the ministry, and can house additional offices in the future if needed $35,000.00

 

Concrete Posts with Chains: 

50 posts, 24” round 3’ high with 3' in ground @ $ 375.00 each: $18,750.00

 


Flag Pole: 

Flag -- 8’ x 12’ & 45 ft. Pole installed: $1,200.00 (UPDATE-Paid and installed)

 

LED Cross:

Single-face Cross, 14’ x 9’ 7’’, red LED, installed, 45’ to top: $2,200.00 (UPDATE- 8/20/2010 This item has been paid for by Bob and Susan Ryan! PTL!!)

 

Sign for Building: 

One single-face sign for building as per approved sketch, 2’ x 17’6’’: $1,300.00

 

Total Project = $ 87,304 .50. Total Still Needed = $59563.95.